Water Treatment Plant Rehabilitation – VA Medical Center

The work performed on this project was comprised of: extensive civil work, piping work, demolition, renovation and improvements to existing space, new construction; concrete work, road work, traffic control with minimal disruption, connection of water lines to active water lines, piping, automated valve control, reservoir level control, SCADA, electrical and lighting. It involved extensive demolition and upgrade of an existing water treatment plant combined with the addition of a new chemical building, and associated yard piping and site work. The site was returned to better than existing condition.

Sheridan, WY VA-259-C-0639 $1,670,516.00