Design – Bid – Build



USS Arizona Memorial Replace Railings

Posted by on Oct 6, 2014 in Design-Bid-Build, Projects | 0 comments

USS Arizona Memorial Replace Railings

Manufacture and install approximately 200 LF of Aluminum Component Railing System and Pedestrian Access Gates in select areas of the visitor center park at Pearl Harbor.  The railing system was secured with epoxy/grout to existing concrete curbs/asphalt and was fabricated to match exiting railings.  The gates included both single and double swing hinges with lockable hasps for padlocks.  Maintaining normal operations, preventing damage to natural surroundings and minimizing disruption to park visitors was required. USS Arizona Memorial, Pearl...

read more

Replacement of Marine Toilet World War II Valor in the Pacific Monument

Posted by on Mar 20, 2012 in Design-Bid-Build, Projects | 0 comments

Replacement of Marine Toilet World War II Valor in the Pacific Monument

This project involved the replacement of restroom and janitorial facilities on the Arizona Memorial including new electrical and mechanical systems. The replacement of the electrical service to the Memorial from the Ford Island transfer station required extensive preconstruction planning and schedule coordination prior to installation. The existing wire in 4” conduit was removed and was followed by the installation of 1200 ft. of new 4-#4/0 wires pulled thru 3 electrical manholes with no splices allowed. Six hundred feet of new submerged...

read more

Water Treatment Plant Rehabilitation – VA Medical Center

Posted by on Mar 20, 2012 in Design-Bid-Build, Projects | 0 comments

Water Treatment Plant Rehabilitation – VA Medical Center

The work performed on this project was comprised of: extensive civil work, piping work, demolition, renovation and improvements to existing space, new construction; concrete work, road work, traffic control with minimal disruption, connection of water lines to active water lines, piping, automated valve control, reservoir level control, SCADA, electrical and lighting. It involved extensive demolition and upgrade of an existing water treatment plant combined with the addition of a new chemical building, and associated yard piping and site...

read more

Interior Maintenance Employee Locker Room – VA Medical Center

Posted by on Mar 20, 2012 in Design-Bid-Build, Projects | 0 comments

Interior Maintenance Employee Locker Room – VA Medical Center

This project consisted of an addition to and renovation of the existing Employee Locker Room facilities. The renovation work occurred along the hallway to the canteen and required isolation of the work process. The addition was originally designed on a series of deep foundations to be driven pipe piles. However, Hawk provided the substitution of helical “screw” piles to substantially reduce the noise and vibration impact on the hospital staff and patients. The construction was conventional structural steel frame with exterior stud wall and...

read more