Refeed ATS 4&7

Correct deficiencies on the electrical distribution of the Out Patient Addition (OPA) of Building 1, all work to meet or exceed NFPA and VA specification standards.  Layout of electrical conduit was determined prior to the destructive procedures, off hour work and lock out/tag out were key components of the work.  The work included:  disconnect four (4) Automatic Transfer Switches (ATS) and reconnect to other ATS’s; install and connect new electrical conductor, conduit and accessories to panel through ATS’s at four (4) locations

VA Medical Center, Grand Junction, CO

VA259-13-C-0061 /$121,635.00