This project is to prepare existing CT Scan Room for replacement with a new Toshiba CT Scanner.  Upgrades to the CT Scan Room and adjacent UPS Room shall include lighting; electrical power; mechanical cooling and ductwork; flooring; sound-proof wall; electrical conduit; wiring and associated controls; concrete coring through the floor to accommodate new unit conduit and cabling; lead-lined door to access UPS Room; demolition and new construction of walls; relocation of MRI trailer to accommodate temporary CT Scanner during construction. Prep of area for relocation of the MRI trailer and coordination with various vendors regarding removal of existing scanner; installation of new scanner and removal/reinstallation and calibration of the existing patient lift.  Infection Control and Interim Life Safety measures will be in place as well as coordination of work causing noise and vibration with adjacent areas in order to maintain normal operations.

Grand Junction, CO Veterans Administration Medical Center

VA259-14-C-0357, $143,146.00