Emergency Generator Replacement- VA Medical Center

The project was to provide a new 400Kw generator and four new Automatic Transfer Switches (ATS) to update the existing emergency electrical power system for the hospital. The work included the removal of the existing generator and an underground fuel storage tank, constructing a four sided EIFS finished concrete enclosure with all VA required security measures to house the new generator and fuel...
read more

Replace Air Handling Unit SPD A-15- VA Medical Center

This design-build construction project entailed the removal and replacement of the existing air handling unit and air distribution system of the Supply, Processing and Distribution Service. The project also replaced the transfer switch that provides emergency power to the equipment buss of Building 1’s power grid. Energy conservation equipment and concepts were integrated into the design. The...
read more

Water Tank Retaining Wall Repair Project- National Memorial Cemetery of the Pacific

The project was to remove the existing retaining wall and install a new retaining wall. The work consisted of design and engineering services, traffic control, excavation, CMU block wall construction, and landscaping. Safety and noise control were integral to the performance of this project at this National Memorial Cemetery. Honolulu, Hawaii VA786A-C-0450 $205,000.00
read more

480 kW Generator Replacement – VA Medical Center

This project replaces and upgrades the existing Cummins 480 kW, 575 kVA diesel powered generator with a 1250 kW, 1360 kVA Cummins generator unit. The new generator system includes a monitored integral above ground diesel fuel tank. The scope of the work includes three new Automatic Transfer Switches and the removal of the existing 2000 gallon underground storage tank and piping.  The concrete...
read more