Electrical Upgrades Pearl City Mini Mart

Awarded on December 18, 2013, this Task Order Design/Build project under the Navy MACC is to provide new distribution pole, (3-50kVA XFMR’s per phase for 150KVA total), pole mounted transformer bank, framing, insulators, lighting arrestors, cutouts and all associated connectors, splices and hardware to upgrade the electrical service and electrical distribution panel boards for the Pearl City...
read more

Replace 8” Waterline along Spruance and Port Royal Streets

Awarded on September 12, 2013, this Task Order Design/Build project under the Navy MACC is to replace the 8” Waterline and associated valves, valve boxes and fire hydrants as required. The project is located within Hickam Air Force Base at Pearl Harbor on the Island of Oahu. NAVFAC Hawaii N62478-13-D-4003, Delivery Order/Call No. 0003, $949,453.00
read more

Repair and Rehabilitate Sewage Lift Station SC-016

Awarded in September of 2013, this Task Order Design/Build project under the Navy MACC is to repair and upgrade key components of the lift station SC-016. The project is located within Hickam Air Force Base at Pearl Harbor on the Island of Oahu. NAVFAC Hawaii N62478-13-D-4003, Delivery Order/Call No. 0002, $1,289,906.00
read more

USS Arizona Memorial Wall Replacement

This is our second project on the USS Arizona Memorial on behalf of Pacific Historic Parks under the guidance of the National Park Service. The work for this project is to survey the Shrine Room wall which lists the names and ranks of the men who died aboard the USS Arizona, procure new marble panels from Vermont, engrave the names on the panels, ship to the USS Arizona Memorial, demo the...
read more

Combat Aviation Brigade Soldier Centered Medical Home

Awarded on September 30, 2013, this Task Order project under the Medical MATOC is to Design and Renovate buildings 680 and 681, which includes exam rooms, treatment and waiting rooms, offices, pharmacy, reception area, storage, file room etc. The existing buildings are one story in height and approximately 6,000 square feet each. The work includes fire sprinkler connections; riser and sprinkler...
read more

Expand E-Wing Loading Dock

Expand E-Wing Loading Dock to include cutting, capping and rerouting irrigation and utility lines, saw cutting, excavating, backfilling, compacting, testing, forming and placing material (dirt and concrete), installing additional truck bumpers electrical outlets and railings. Pacific Islands Healthcare System, Honolulu, HI VA261-13-C-0049, $269,000.00
read more