Replace Elevators Building 1634

Awarded on September 12, 2014, this Task Order project under the Navy MACC is a Design-Build task order, integrating sustainable design strategies, to remove and replace with three (3) new elevators for Building 1634, Utah Hall, JBPHH, Hawaii.  The work includes provision of one (1) new elevator of minimum 3,500 pound capacity, side open car sized for an ambulance stretcher; two (2) elevators...
read more

CT Scan Room Prep

This project is to prepare existing CT Scan Room for replacement with a new Toshiba CT Scanner.  Upgrades to the CT Scan Room and adjacent UPS Room shall include lighting; electrical power; mechanical cooling and ductwork; flooring; sound-proof wall; electrical conduit; wiring and associated controls; concrete coring through the floor to accommodate new unit conduit and cabling; lead-lined door...
read more

Replace Evaporative Coolers Building 6

This project is to facilitate indoor air quality improvements with the installation of seven (7) individual refrigeration fan coil units.  The work will include:  removal of existing landscaping; installation of concrete pads for remote condensing units; provide electrical conductors, conduit, conduit fittings, breakers, disconnects for new electrical to fan coil and condenser units; install...
read more

Install Flooring and Life Safety at Eye Clinic

This project consists of demolition of flooring, floor prep, installation and integration with existing system of fire suppression and controls, installation of flooring. This is a quick turn-around project of only 55 days from Notice to Proceed and requires coordination with other trades and contractors working in the same area. Material procurement and delivery were key items to maintain the...
read more

Install Security Measures

Awarded on August 5, 2014, this Task Order project under the Navy MACC is a Design-Build task order, integrating sustainable design strategies, to provide physical security for Building 3510H currently know as Weapon system Maintenance Management Facility. The design will provide for new electrical gate operator and keypad, intercom system, protective bollards, new LED exterior Flood lights, 1...
read more

Replace Chilled Water Pipes

Awarded on August 5, 2014, this Task Order project under the Navy MACC is a Design-Build task order, integrating sustainable design strategies, to replace the chilled water piping, fan coil units (FCU) and damaged surfaces/framing at Building 1156H, Joint Base Pearl Harbor Hickam (JBPHH). Two 45-ton chillers located behind Building 1160H work intermittently to cool Building 1156H, 1158H as well...
read more