Replace Elevators Building 1634

Awarded on September 12, 2014, this Task Order project under the Navy MACC is a Design-Build task order, integrating sustainable design strategies, to remove and replace with three (3) new elevators for Building 1634, Utah Hall, JBPHH, Hawaii.  The work includes provision of one (1) new elevator of minimum 3,500 pound capacity, side open car sized for an ambulance stretcher; two (2) elevators...
read more

CT Scan Room Prep

This project is to prepare existing CT Scan Room for replacement with a new Toshiba CT Scanner.  Upgrades to the CT Scan Room and adjacent UPS Room shall include lighting; electrical power; mechanical cooling and ductwork; flooring; sound-proof wall; electrical conduit; wiring and associated controls; concrete coring through the floor to accommodate new unit conduit and cabling; lead-lined door...
read more

Replace Evaporative Coolers Building 6

This project is to facilitate indoor air quality improvements with the installation of seven (7) individual refrigeration fan coil units.  The work will include:  removal of existing landscaping; installation of concrete pads for remote condensing units; provide electrical conductors, conduit, conduit fittings, breakers, disconnects for new electrical to fan coil and condenser units; install...
read more

USS Arizona Memorial Replace Railings

Manufacture and install approximately 200 LF of Aluminum Component Railing System and Pedestrian Access Gates in select areas of the visitor center park at Pearl Harbor.  The railing system was secured with epoxy/grout to existing concrete curbs/asphalt and was fabricated to match exiting railings.  The gates included both single and double swing hinges with lockable hasps for padlocks. ...
read more

Virtual Library Remodel

This project was to reconfigure/remodel existing areas within the Library.  The work included: upgrade electrical to provide additional lighting, circuits and new four-plex receptacles /data jacks to accommodate new uses of the spaces; new equipment and furniture layout; new HVAC supply and return ducts; HVAC graphics changes and integration with remote monitoring system, relocate thermostats;...
read more